Client: Rio Tinto
Location: Cape Lambert Port Facility – 50km North of Karratha

Cape Lambert Road Surfaces Upgrade (In Partnership with Multiplant)

This project consisted of the upgrade of several existing gravel roads within the Cape Lambert Port ‘A’ Facility.  This works included foam Bitumen and Cement Stabilisation, Formation Reconstruction, Drainage, Two Coat sealing, Asphalt Works, Line Marking, Barrier Installation and Signage.  Additional variation works to the value of $1.5m were included by the Client which were completed within the original construction scope timeframe.